Cases

Case show

  • Categories:Case
  • Author:
  • Origin:
  • Time of issue:2021-08-06
  • Views:

(Summary description)Through the implementation of the two-year plan, Colombo has been divided into five primary measurement zones; At the same time, according to the revenue data of the water department, some large water users have been replaced with high-precision electromagnetic water meters and remotely monitored; 28 pressure monitoring points are added to the pipe network. By the end of 2017, the leakage rate had been reduced to 32%.

Case show

(Summary description)Through the implementation of the two-year plan, Colombo has been divided into five primary measurement zones; At the same time, according to the revenue data of the water department, some large water users have been replaced with high-precision electromagnetic water meters and remotely monitored; 28 pressure monitoring points are added to the pipe network. By the end of 2017, the leakage rate had been reduced to 32%.

  • Categories:Case
  • Author:
  • Origin:
  • Time of issue:2021-08-06 16:16
  • Views:
Information

  Through the implementation of the two-year plan, Colombo has been divided into five primary measurement zones; At the same time, according to the revenue data of the water department, some large water users have been replaced with high-precision electromagnetic water meters and remotely monitored; 28 pressure monitoring points are added to the pipe network. By the end of 2017, the leakage rate had been reduced to 32%.

 

案例

Previous: Case show
Previous: Case show

© 2021 Kailiu Instrument Co., Ltd  All rights reserved.         豫ICP备15034290号           Powered by www.300.cn          SupportedIPV6

© 2021 Kailiu Instrument Co., Ltd  All rights reserved.

豫ICP备15034290号     Powered by www.300.cn

SupportedIPV6