Case show
- Categories:Case
- Author:
- Origin:
- Time of issue:2021-08-06
- Views:
(Summary description)Through the implementation of the two-year plan, Colombo has been divided into five primary measurement zones; At the same time, according to the revenue data of the water department, some large water users have been replaced with high-precision electromagnetic water meters and remotely monitored; 28 pressure monitoring points are added to the pipe network. By the end of 2017, the leakage rate had been reduced to 32%.
Case show
(Summary description)Through the implementation of the two-year plan, Colombo has been divided into five primary measurement zones; At the same time, according to the revenue data of the water department, some large water users have been replaced with high-precision electromagnetic water meters and remotely monitored; 28 pressure monitoring points are added to the pipe network. By the end of 2017, the leakage rate had been reduced to 32%.
- Categories:Case
- Author:
- Origin:
- Time of issue:2021-08-06 16:16
- Views:
Through the implementation of the two-year plan, Colombo has been divided into five primary measurement zones; At the same time, according to the revenue data of the water department, some large water users have been replaced with high-precision electromagnetic water meters and remotely monitored; 28 pressure monitoring points are added to the pipe network. By the end of 2017, the leakage rate had been reduced to 32%.
ABOUT US
CONTACT US
Tel: +86-371-22959056
Fax: +86-371-22859056
E-mail: info@klflow.com
Add: Pi Tun south road, shunhe district, kaifeng city, henan province, China
© 2021 Kailiu Instrument Co., Ltd All rights reserved. 豫ICP备15034290号 Powered by www.300.cn SupportedIPV6
© 2021 Kailiu Instrument Co., Ltd All rights reserved.
豫ICP备15034290号 Powered by www.300.cn
SupportedIPV6